.OSH 2304-19.01.01-1B24-S3, Introduction to Contractor Safety Unit VII Scholarly Activity Unit VII Scholarly Activity

Your facility is going through some upgrades, including the construction of a new office and training center, and Acme General Contractors, Inc. is the general contractor who’s been contracted to perform this work. The local OSHA Area Office visited the construction site and found several violations of which the contractor is responsible.


Under the multi-employer policy, your company, as the “controlling”, or “host” company, received an OSHA citation for not having an emergency action plan (EAP) in place that included contracting firms. You have been hired as the company safety officer to develop and implement the program required by OSHA that includes all contractors on site, and in particular, the new construction project.


The new office/training facility is two (2) stories tall. The ongoing construction activities are concrete masonry units (CMU) block exterior walls and a standing seam metal roof on the exterior, along with underground utility installation requiring excavations. The masons are working from scaffolding, and the roofers are tied off to anchor points. They access the roof area using aerial lifts or the exterior stair tower on the south end.


In the interior of the building, framing and drywall is being installed, the electricians are working to install permanent power, the plumbers and HVAC trades are working from ladders to install their work. Lighting is temporary string lights. The elevator has not been installed yet, however there is an exterior material lift that also carries the workers to their respective floors where they are working. On the upper floor, the stairs have not been installed yet, and access is gained by using a ladder in a floor opening that will eventually be covered.


Prepare a written EAP containing all the information required by 29 C.F.R. 1926.34 and 1926.35. Your plan must address how you will specifically address the requirement for medical services and first aid, means of egress and how to notify workers of an emergency and employee training. Additionally, include a section that addresses how you will reduce the risk of and respond to acts of violence at the worksite.


Your plan must be at least three pages in length, not counting your title page and reference page. You must include at least two academic references. Adhere to APA Style when creating citations and references for this assignment. APA formatting, however, is not necessary.

Do you need help with this paper? 🏆 - Let us help you write it!

Why Choose Our Essay Writing Service?

  • ✅ Original writing: Our expert writers will write each paper from scratch, ensuring complete originality, zero plagiarism and AI free content.
  • ✅ Expert Writers: Our seasoned professionals are ready to deliver top-quality papers tailored to your needs.
  • ✅ Guaranteed Good Grades: Impress your professors with outstanding work.
  • ✅ Fast Turnaround: Need it urgently? We've got you covered!
  • ✅ 100% Confidentiality: Customer privacy is our number one priority. Your identity is anonymous to our writers.
🎓 Why wait? Let us help you succeed! Our Writers are waiting..

Get started

Starts at $9 /page

How our paper writing service works

It's very simple!

  • Fill out the order form

    Complete the order form by providing as much information as possible, and then click the submit button.

  • Choose writer

    Select your preferred writer for the project, or let us assign the best writer for you.

  • Add funds

    Allocate funds to your wallet. You can release these funds to the writer incrementally, after each section is completed and meets your expected quality.

  • Ready

    Download the finished work. Review the paper and request free edits if needed. Optionally, rate the writer and leave a review.